  1. Did they pay out from different accounts? I received 58k today from the Indy location, but it's the same account that my normal pay comes from. Not sure if they were lumped together or if I haven't received my normal last pay check yet?
  2. Even after approval AFPC can't not fuc! Up. First email was approved 29 Sep. Second email was 1 Aug date change request denied. Still 29 Sep, which is what I want now that the approvals were delayed 2.5 months. Today's email says "please disregard system generated emails. Your actual separation is 31 july." WTF! Get it right just once AFPC. Now I have to apply under hardship (terminal starts last week) to get it changed back to 29 Sep.
  3. 2005 11M approved. And currently in an RPA billet. Holy sh!t batman! 2 emails. One approving original 29 Sep request the other disapproving the change to 1 aug.
  4. Looks like vMPF went down a few hours before the scheduled maintenance. "We tried to get the notifications out before 1700 but vMPF wouldn't let us."
  5. 30 September I could probably swing. The 1 Aug date I put on my app is going to be difficult with terminal and PTDY. Speaking of family concerns, baby due Sep. Should be interesting. What I expect to see on my denial email:"We regret to inform you that your VSP application was denied because you selected a date too early to allow for you to take terminal leave prior to separation. You should have known better. Please reapply in round two with a date that makes sense you moron."
  6. Has everyone seen the webinar slides posted on myPers dated 8 Apr? Slide 6 is particularly interesting. Says "airmen receive 120 days from notification to separation" as a change. So they're going to change all the approvals to a September separation or they're just bad at math? This other nugget in particular worries me as an RPA guy. "Adjudicating rated applications by RDTM AND PAS. Need to ensure retention of Airmen with specialized training for critical missions." Sooooo.... Our current assigned unit is now a consideration? Fantastic. 11M with an 18S AFSC should be a red flag then. Just get on with it already.
  7. Nothing in 14-08 specifies Apps with ADSCs will be "adjudicated" after 1 May. It says all remaining. However, we are seeing apps still being processed. So who's to say they are in fact waiting on 11X apps other than the fact that we haven't seen a lot of applications results lately on here?
  8. 98-03 11M is now red. Sorry man. Maybe next round?
  9. Hmmm. Alpha tour to white jet tour. That'd really "broaden" my career.
  10. It was on the RIF overage matrix before they took it down in Feb. I can't remember exactly but I think we(05) were around 18%-22% overage out of those eligible (64 overage out of 280ish eligible)?
  11. I know it's not first come first served but it doesn't look like batches either. I feel like I'm waiting to get picked in dodge ball and the line is getting smaller every day.
  12. New PSDMs this week huh? Ahh, another broken promise from AFPC. At least they are consistent.
  13. I thought that authority had already been delegated? That'll be 3 months to get through all those.
  14. [quote name="MooseDriver1" post="377343" ** All apps that required waiver are being held until application window closes on 1 May. They will then be batch processed. ** - directly from AFPC Separations Branch Chief So, if you have an ADSC that originally excluded you, you can stop checking CMS 10 times a day and just continue to wait..... Sorry it's not "you're getting approved tomorrow" news, but at least it's something official. From AFPC's standpoint, this allows them to get through all those with no ADSC remaining and then determine if they need to approve any with waivers. The they will approve the people in each yr group with the least amount....
  15. I think I'm going to save and print my myPers incident from a Feb phone call that says "PSDM 14-08 does not apply to you if you are eligible for the RIF. VSP provisions in 13-130 apply to RIF eligible officers." Those are the provision I thought I was applying under, which did not refer to 13-65 for ADSC waivers or recoupment of money for ADSCs. If this was a courtroom, they'd be fooked.
  16. Another day gone by with no sign of rescue from this desert island.
  17. LADSC waiver program which is originally where the ADSC waiver table came from in 13-65.
  18. I like how the only thing they changed on the time line slide was to remove the icon for when airmen will get notified of their package approval/denial.
  19. Certainly in that case but that is different than pulling an active app IOT resubmit. Lucky for me my CC slow rolled the app trying to game the system and it reached AFPC after that initial denial wave blew over.
  20. I would very much doubt everyone who's been approved so far put in a new application, had it go through both commanders and approved by AFPC the same day. At most we're talking new SOUs uploaded but then the SOU from 14-08 hasn't changed so what's the point?
  21. True. The UPT direct folks still have the big blue guarantee to follow on with manned after their initial RPA tour. Not so for the few previous MWS folks.
  22. Well if it makes you feel any better I'm envious and would take an MC12 assignment post haste. My chances to return don't look much better.
×
×